Skip to content
Friday, August 15, 2025

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Spar Caps

Posted on June 6, 2009March 7, 2010 by Glenn

Spar cap fitting and pre-drilling.

4.83 hours.

Posted in Wing

Post navigation

Previous: Wing Ribs
Next: Spar Caps

Related Posts

  • Wing

Cutting and form blocks

  • Glenn
  • October 7, 2007
  • 0

Finished form blocks, started on cutting blocks. 4.50 hours

  • Wing

Rear rib lightening holes

  • Glenn
  • February 4, 2008
  • 0

Began cutting lightening holes in rear ribs with fly-cutter. 0.88 Hours

  • Wing

Cutting blocks, bevelling form blocks

  • Glenn
  • October 13, 2007
  • 0

Bevelled form blocks with disc sander- see Tools section. Continued making cutting blocks for wing ribs. 6.53 hours

Copyright © 2025 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.