Spar Cap Angles

Posted on April 12, 2009September 23, 2009 by Glenn

Drag out new sheet of 0.032, begin cutting for Spar Cap Angles.

3.67 Hours.

Posted in Wing

Post navigation

Previous: Rear Channels
Next: Spar Cap Angles

Related Posts

  • Wing

Lightening holes

  • Glenn
  • February 6, 2008
  • 0

Continue with wing rib lightening holes. 0.70 Hours

  • Wing

6-W-7 3 Hinge Doubler

  • Glenn
  • November 9, 2008
  • 0

6-W-7 3 Hinge Doubler. .85 Hours.

  • Wing

Wing ribs

  • Glenn
  • December 29, 2007
  • 0

Continue with rear ribs- RR#7, RR#6 – also modified fluting pliers. 3.35 hours. Total for December 57.60 hours. Total time overall: 193.97 hours.

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.