Skip to content
Friday, August 15, 2025

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Rudder Skeleton

Posted on December 27, 2008December 28, 2008 by Glenn

Re-assemble primed rudder skeleton, begin riveting.

0.75 Hours.

Posted in Empennage

Post navigation

Previous: Wingtip Top Angles
Next: Rudder Skeleton

Related Posts

  • Empennage

Rudder Skin

  • Glenn
  • May 11, 2008
  • 0

Cut skin oversize, however bottom edge dimension is a tad under full skin width bent okay, but bends slightly uneven. Will make another- no problem […]

  • Empennage

Elevator ribs

  • Glenn
  • December 10, 2007
  • 0

Finish cutting elevator ribs, de-burr, drill relief holes, bend first one. 1.83 hours.

  • Empennage

Tip rib test #2

  • Glenn
  • September 16, 2007
  • 0

Do second test of rudder tip rib with new form block. 7.6 hrs

Copyright © 2025 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.