Skip to content
Friday, November 20, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Rear Channels

Posted on April 5, 2009September 23, 2009 by Glenn

More rear channel bending…

6.28 Hours.

Posted in Wing

Post navigation

Previous: Rear Channels
Next: Flanging Wing Ribs

Related Posts

  • Wing

De-burring

  • Glenn
  • September 21, 2008
  • 0

De-burr Nose Rib Angles and Hat Stiffeners, various other parts. 2.75 Hours.

  • Wing

Nose Ribs, Rear Ribs

  • Glenn
  • April 13, 2008
  • 0

Continue cutting sheet, re-make one RR#8 to replace one with too large rear lightening hole. 5.88 hours.

  • Wing

6-W-7 3 Hinge Doubler

  • Glenn
  • November 9, 2008
  • 0

6-W-7 3 Hinge Doubler. .85 Hours.

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.