Skip to content
Saturday, August 22, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Rear Channels

Posted on April 5, 2009September 23, 2009 by Glenn

More rear channel bending…

6.28 Hours.

Posted in Wing

Post navigation

Previous: Rear Channels
Next: Flanging Wing Ribs

Related Posts

  • Wing

Nose Ribs

  • Glenn
  • June 20, 2009
  • 0

Flange Nose Rib lightening holes. 2.55 hours.

  • Wing

Nose Ribs

  • Glenn
  • April 25, 2008
  • 0

De-burr nose rib blanks, formed first two nose ribs. 2.90 hours.

  • Wing

Cutting wing skin, spar webs, etc.

  • Glenn
  • February 24, 2008
  • 0

Cutting sheets- cut one rear bottom skin 6-W-2 8, readied .040 sheet for cuttiing spar webs, etc. 1.93 Hours.

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.