Skip to content
Friday, August 15, 2025

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Nose Ribs

Posted on April 12, 2008August 5, 2008 by Glenn

Begin cutting new sheet of 0.025 for nose ribs.

2.58 hours.

Posted in Wing

Post navigation

Previous: Firewall Stiffeners
Next: Nose Ribs, Rear Ribs

Related Posts

  • Wing

Wing ribs truing

  • Glenn
  • January 25, 2008
  • 0

Completed truing up the flanges on the rear ribs and adjusting any bows in them. 1.5 hours.

  • Wing

Lightening holes

  • Glenn
  • February 10, 2008
  • 0

Continue with lightening holes. Once complete, bring in next sheet of 0.025 and start cutting. 5.15 Hours.

  • Wing

Centre Spar Caps & Doublers

  • Glenn
  • May 10, 2009
  • 0

Mark out and cut Centre Spar Caps. . I simply cut these with the hacksaw, mainly because it was quicker than dragging the table saw […]

Copyright © 2025 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.