Skip to content
Monday, February 23, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Lower Bearing Support

Posted on July 5, 2009March 7, 2010 by Glenn

6-B-8 9 Lower Bearing Support.

1.8 hours.

Posted in Fuselage

Post navigation

Previous: Tie Down Rings, Torque Tube Bearing
Next: Elevator

Related Posts

  • Fuselage

6-B-10 1 Cabin Floor

  • Glenn
  • December 6, 2008
  • 0

Cut out Cabin Floor

  • Fuselage

6-B-8 1 Gear Gussets

  • Glenn
  • December 6, 2008
  • 0

Marked out gear gussets from 40 thou stock. 0.5 Hours.

  • Fuselage

Fuselage December 2009

  • Glenn
  • December 19, 2009
  • 0

Date Job Start Time Finish Time Total Time Decimal 5/12/2009 Form bulkheads 6-B-12 1, 2 & 3 12:45 15:52 3:07 3.12 16:30 18:00 1:30 1.50 […]

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.