Posted on July 5, 2009March 7, 2010 by Glenn

6-B-8 9 Lower Bearing Support.

1.8 hours.

Posted in Fuselage

Post navigation

Previous: Tie Down Rings, Torque Tube Bearing
Next: Elevator

Related Posts

  • Fuselage

6-B-1 1, 6-B-5 1&2

  • Glenn
  • October 4, 2008
  • 0

Continued cutting up 0.032 sheet and bent parts.

  • Fuselage

6-B-10 1 Cabin Floor

  • Glenn
  • December 6, 2008
  • 0

Cut out Cabin Floor

  • Fuselage

Fuselage Form Blocks

  • Glenn
  • February 9, 2009
  • 0

Rough cut MDF sheet for bulkhead form blocks. 0.51 Hours.