Skip to content
Friday, August 15, 2025

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Elevator ribs

Posted on December 15, 2007July 23, 2025 by Glenn

Completed elevator ribs.

2.17 hours.

Posted in Empennage

Post navigation

Previous: Elevator ribs
Next: Rudder

Related Posts

  • Empennage

Elevator

  • Glenn
  • July 19, 2009
  • 0

Cut out Elevator Skin. 4 hours.

  • Empennage

Elevator

  • Glenn
  • July 26, 2009
  • 0

Elevator construction. 5.92 hours.

  • Empennage

Rudder Spar

  • Glenn
  • February 13, 2008
  • 0

Cut and bend vertical tail spar. Rudder RR#1. 1.58 Hours.

Copyright © 2025 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.