Skip to content
Monday, February 23, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Crimp cutouts contd…

Posted on October 30, 2007August 5, 2008 by Glenn

Complete cutouts in form blocks.

1.0 hour.

Total for October 42.08 hours.

Total time overall: 103.82 hrs

Posted in Wing

Post navigation

Previous: Crimp cutouts contd…
Next: Nose rib form blocks

Related Posts

  • Wing

Wing ribs

  • Glenn
  • December 26, 2007
  • 0

Continue with rear ribs. 3.97 hours.

  • Wing

Spar Cap Angles

  • Glenn
  • April 13, 2009
  • 0

Continue cutting and bending. 3.75 Hours.

  • Wing

Nose Ribs

  • Glenn
  • June 20, 2009
  • 0

Flange Nose Rib lightening holes. 2.55 hours.

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.