Cut out Elevator Skin. 4 hours.
Author: Glenn
Tie Down Rings, Torque Tube Bearing
Cleaned up Aileron Bellcranks. Went ahead and made 6-W-9-1 Tiedown Rings, 6-B-17 Rear Torque Tube Bearing. 4.63 hours.
Alieron Bellcranks
Went flying with Tony this morning in his RV. Afternoon spent making second Aileron Bellcrank. 2 hours.
Aileron Bellcranks
Made 6-W-6 10 Bellcrank Support Channels and first Aileron Bellcrank 6-W-10 1. 3.1 hours.