Skip to content
Friday, November 20, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Ailerons.

Posted on December 16, 2007August 28, 2024 by Glenn

Bend remaining ribs, cut aileron skins and de-burr.

3.65 hours.

Posted in Wing

Post navigation

Previous: Rudder
Next: Wing ribs

Related Posts

  • Wing

Spar Tips

  • Glenn
  • November 2, 2008
  • 0

Fabricate Spar Tips. 3.52 Hours.

  • Fuselage
  • Wing

Tie Down Rings, Torque Tube Bearing

  • Glenn
  • June 28, 2009
  • 0

Cleaned up Aileron Bellcranks. Went ahead and made 6-W-9-1 Tiedown Rings, 6-B-17 Rear Torque Tube Bearing. 4.63 hours.

  • Wing

Wing ribs

  • Glenn
  • January 20, 2008
  • 0

Tidy up joggles. Spent quite a lot of today researching issues surrounding joggles, etc. I was a bit concerned the rounds on the joggles were […]

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.