Skip to content
Monday, February 23, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Ailerons.

Posted on December 16, 2007August 28, 2024 by Glenn

Bend remaining ribs, cut aileron skins and de-burr.

3.65 hours.

Posted in Wing

Post navigation

Previous: Rudder
Next: Wing ribs

Related Posts

  • Wing

Wing ribs

  • Glenn
  • December 18, 2007
  • 0

Get blanks ready for trimming. 2.47 hours.

  • Wing

Wing Spars February 2010

  • Glenn
  • February 28, 2010
  • 0

Date Job Start Time Finish Time Total Time Decimal 6/02/2010 Spar Upgrade Root Doublers 6-ZU-1 2 11:45 13:00 1:15 1.25 14:15 15:43 1:28 1.47 16:15 […]

  • Wing

Wing August 2009

  • Glenn
  • August 30, 2009
  • 0

Date Job Start Time Finish Time Total Time Decimal 23/08/2009 Flaps 14:00 16:17 2:17 2.28 16:45 17:50 1:05 1.08 29/08/2009 Flap skin 11:00 13:05 2:05 […]

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.