Skip to content
Friday, August 15, 2025

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Wing ribs

Posted on January 6, 2008August 5, 2008 by Glenn

Opposite RR#5

1.25 hours.

Posted in Wing

Post navigation

Previous: Wing ribs
Next: Wing ribs

Related Posts

  • Wing

Ailerons

  • Glenn
  • January 4, 2009
  • 0

Ailerons-

  • Wing

Spar Cap Angles

  • Glenn
  • June 20, 2009
  • 0

Pilot drill replacement angles to Spar Webs. 0.75 hours.

  • Wing

Wing ribs

  • Glenn
  • January 23, 2008
  • 0

Joggles completed using block in vice method- see photos. I had more success by cramping in this method and hammering down with a piece of […]

Copyright © 2025 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.