Skip to content
Friday, August 15, 2025

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Wing ribs

Posted on December 23, 2007August 5, 2008 by Glenn

Make first rear rib, work on joggle method.

1.7 hours.

Posted in Wing

Post navigation

Previous: Wing ribs
Next: Wing ribs

Related Posts

  • Wing

Wing September 2009

  • Glenn
  • September 27, 2009
  • 0

Date Job Start Time Finish Time Total Time Decimal 12/09/2009 Make timber brackets for spar assembly 15:00 18:00 3:00 3.00 13/09/2009 Drill out spar pilot […]

  • Wing

Lightening holes

  • Glenn
  • February 6, 2008
  • 0

Continue with wing rib lightening holes. 0.70 Hours

  • Wing

Rear Ribs

  • Glenn
  • April 20, 2008
  • 0

Form opposite RR#9, cut lightening holes in RRs #8 & #9 both sides. 5.27 hours.

Copyright © 2025 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.