Posted on April 13, 2009September 23, 2009 by Glenn

Continue cutting and bending.

3.75 Hours.

Posted in Wing

Post navigation

Previous: Spar Cap Angles
Next: Spar Cap Angles

Related Posts

  • Wing

Cutting 0.040 Sheet

  • Glenn
  • March 16, 2008
  • 0

Continue cutting 0.040 sheet. Late start, had to take cat to vet after a fight with another cat! 0.42 hours.

  • Fuselage
  • Wing

Tie Down Rings, Torque Tube Bearing

  • Glenn
  • June 28, 2009
  • 0

Cleaned up Aileron Bellcranks. Went ahead and made 6-W-9-1 Tiedown Rings, 6-B-17 Rear Torque Tube Bearing. 4.63 hours.

  • Wing

6-W-LO1 2 Locker Rear Panel

  • Glenn
  • December 6, 2008
  • 0

6-W-LO1 2 Locker Rear Panel