Skip to content
Friday, August 15, 2025

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Rear Channels

Posted on April 11, 2009September 23, 2009 by Glenn

Completed adjusting and truing channels by hand.

2.58 Hours.

Posted in Wing

Post navigation

Previous: Rear Channels
Next: Spar Cap Angles

Related Posts

  • Wing

Wing ribs

  • Glenn
  • December 29, 2007
  • 0

Continue with rear ribs- RR#7, RR#6 – also modified fluting pliers. 3.35 hours. Total for December 57.60 hours. Total time overall: 193.97 hours.

  • Wing

6-W-LO1 2 Locker Rear Panel

  • Glenn
  • December 6, 2008
  • 0

6-W-LO1 2 Locker Rear Panel

  • Wing

Spars, fuel tank skins.

  • Glenn
  • April 25, 2009
  • 0

Re-check Spar Web markings, de-burr edges prior to drilling. Cut Fuel Tank Skins to size. 4.33 Hours.

Copyright © 2025 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.