Skip to content
Saturday, August 22, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Rear Channels

Posted on April 11, 2009September 23, 2009 by Glenn

Completed adjusting and truing channels by hand.

2.58 Hours.

Posted in Wing

Post navigation

Previous: Rear Channels
Next: Spar Cap Angles

Related Posts

  • Wing

Spar Webs

  • Glenn
  • April 26, 2009
  • 0

Pilot drill Main Spar Webs. 4.13 Hours.

  • Wing

Nose Ribs

  • Glenn
  • June 20, 2009
  • 0

Flange Nose Rib lightening holes. 2.55 hours.

  • Wing

Centre Spar Caps & Doublers

  • Glenn
  • May 10, 2009
  • 0

Mark out and cut Centre Spar Caps. . I simply cut these with the hacksaw, mainly because it was quicker than dragging the table saw […]

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.