Skip to content
Monday, February 23, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Rear Channels

Posted on April 5, 2009September 23, 2009 by Glenn

More rear channel bending…

6.28 Hours.

Posted in Wing

Post navigation

Previous: Rear Channels
Next: Flanging Wing Ribs

Related Posts

  • Wing

Spars, fuel tank skins.

  • Glenn
  • April 25, 2009
  • 0

Re-check Spar Web markings, de-burr edges prior to drilling. Cut Fuel Tank Skins to size. 4.33 Hours.

  • Wing

Aileron Skins

  • Glenn
  • June 9, 2008
  • 0

Scoured the skins in preparation for priming. I wanted to do this before bending, as it I knew it would be a lot easier than […]

  • Wing

Crimp cutouts contd…

  • Glenn
  • October 30, 2007
  • 0

Complete cutouts in form blocks. 1.0 hour. Total for October 42.08 hours. Total time overall: 103.82 hrs

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.