Skip to content
Saturday, August 22, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Rear Channels

Posted on April 5, 2009September 23, 2009 by Glenn

More rear channel bending…

6.28 Hours.

Posted in Wing

Post navigation

Previous: Rear Channels
Next: Flanging Wing Ribs

Related Posts

  • Wing

Ailerons

  • Glenn
  • February 22, 2009
  • 0

Continue pre-drilling starboard aileron. 3.65 Hours.

  • Wing

Wing Spar Hat Stiffeners

  • Glenn
  • September 6, 2008
  • 0

The hat stiffeners for the spar webs proved to be quite a task

  • Wing

Wing September 2009

  • Glenn
  • September 27, 2009
  • 0

Date Job Start Time Finish Time Total Time Decimal 12/09/2009 Make timber brackets for spar assembly 15:00 18:00 3:00 3.00 13/09/2009 Drill out spar pilot […]

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.