Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Fuselage Form Blocks

Posted on February 17, 2009February 21, 2009 by Glenn

Instrument Panel & Middle Bulkhead form blocks marked out.

1.58 Hours.

Posted in Fuselage

Post navigation

Previous: Baggage Bulkhead Form Block
Next: Rudder Assembly

Related Posts

  • Fuselage

6-B-5 Gear Channel

  • Glenn
  • September 21, 2008
  • 0

Cut and bend 6-B-5 Gear Channel.

  • Fuselage
  • Tools

Fuselage, Tools January 2010

  • Glenn
  • January 17, 2010
  • 0

Date Job Start Time Finish Time Total Time Decimal 1/01/2010 Modify brake handle – move braces out from centre 11:00 12:50 1:50 1.83 Bend second […]

  • Fuselage

6-B-8 1 Gear Gussets

  • Glenn
  • December 6, 2008
  • 0

Marked out gear gussets from 40 thou stock. 0.5 Hours.