Skip to content
Saturday, April 11, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Baggage Bulkhead Form Block

Posted on February 16, 2009February 21, 2009 by Glenn

Mark out Baggage Back Bulkhead form block.

0.95 Hours.

Posted in Fuselage

Post navigation

Previous: Fuselage Bulkhead Form Blocks
Next: Fuselage Form Blocks

Related Posts

  • Fuselage

Fuselage December 2009

  • Glenn
  • December 19, 2009
  • 0

Date Job Start Time Finish Time Total Time Decimal 5/12/2009 Form bulkheads 6-B-12 1, 2 & 3 12:45 15:52 3:07 3.12 16:30 18:00 1:30 1.50 […]

  • Fuselage

Fuselage form blocks

  • Glenn
  • March 1, 2009
  • 0

Trimmed and rounded fuselage form blocks. 3.08 Hours.

  • Fuselage

6-B-10 1 Cabin Floor

  • Glenn
  • December 6, 2008
  • 0

Cut out Cabin Floor

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.