Rudder Skeleton

Posted on December 27, 2008December 28, 2008 by Glenn

Re-assemble primed rudder skeleton, begin riveting.

0.75 Hours.

Posted in Empennage

Post navigation

Previous: Wingtip Top Angles
Next: Rudder Skeleton

Related Posts

  • Empennage
  • Horizontal Stabiliser

Stabiliser Ribs

  • Glenn
  • December 2, 2007
  • 0

I formed the stabiliser ribs as per the wing ribs, sandwiched between a form block and a blank. These all have a flange on the […]

  • Empennage

Rudder Assembly

  • Glenn
  • February 21, 2009
  • 0

Rudder final assembly Prime rudder skins internally, rivet to skeleton. 5.38 Hours.

  • Empennage

Rudder Tip Rib

  • Glenn
  • January 28, 2008
  • 0

After three more attempts and experiments I finally arrived at one I was happy with. One of the problems I had was the plans are […]

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.