Skip to content
Friday, August 15, 2025

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Rudder Skeleton

Posted on December 27, 2008December 28, 2008 by Glenn

Re-assemble primed rudder skeleton, begin riveting.

0.75 Hours.

Posted in Empennage

Post navigation

Previous: Wingtip Top Angles
Next: Rudder Skeleton

Related Posts

  • Empennage

Rudder nose rib

  • Glenn
  • January 27, 2008
  • 0

Continued and made two more rudder nose ribs until I finished with one I was happy with. 2.58 hours.

  • Empennage

Rudder

  • Glenn
  • December 15, 2007
  • 0

Cut and begin bend rudder ribs. Obviously if you’ve bought the kit from Zenith, you won’t have to do any of this, but the rudder […]

  • Empennage

Rudder Skins

  • Glenn
  • May 31, 2008
  • 0

Form nose skin, begin laying out rear skin for fitting. 5.75 Hours.

Copyright © 2025 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.