Skip to content
Friday, November 20, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Rudder Skeleton

Posted on December 27, 2008December 28, 2008 by Glenn

Re-assemble primed rudder skeleton, begin riveting.

0.75 Hours.

Posted in Empennage

Post navigation

Previous: Wingtip Top Angles
Next: Rudder Skeleton

Related Posts

  • Empennage

Elevator August 2009

  • Glenn
  • August 30, 2009
  • 0

Date Job Start Time Finish Time Total Time Decimal 1/08/2009 Elevator skin contd… 12:00 13:10 1:10 1.17 Decided error in depth too great, also pre-drilled […]

  • Empennage

Rudder Nose Skin (Rebuilt)

  • Glenn
  • June 7, 2008
  • 0

ZAC responded to my enquiries and advised my skin fit was fine, however, I noticed during the week a smiley on one face. Only small, […]

  • Empennage

Priming Rudder Parts

  • Glenn
  • September 14, 2008
  • 0

The temperature has finally got above 15 degrees

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.