Skip to content
Monday, February 23, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

6-W-3 9 Nose Rib Angles

Posted on September 20, 2008September 20, 2008 by Glenn

Cut and folded nose rib angles.

3.83 Hours

Posted in Wing

Post navigation

Previous: 6-W-4 1 & 2 Centre Spar Webs
Next: De-burring

Related Posts

  • Wing

Cutting 0.040 Sheet

  • Glenn
  • March 17, 2008
  • 0

Continue cutting 40 thou sheet. 2.03 hours

  • Wing

Alieron Bellcranks

  • Glenn
  • June 27, 2009
  • 0

Went flying with Tony this morning in his RV. Afternoon spent making second Aileron Bellcrank. 2 hours.

  • Wing

Wing Spars

  • Glenn
  • August 31, 2008
  • 0

Set out wing spar webs. Also spent some time divising methods of forming Hat Stiffeners. 6.17 Hours.

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.