Skip to content
Monday, February 23, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

6-W-3 9 Nose Rib Angles

Posted on September 20, 2008September 20, 2008 by Glenn

Cut and folded nose rib angles.

3.83 Hours

Posted in Wing

Post navigation

Previous: 6-W-4 1 & 2 Centre Spar Webs
Next: De-burring

Related Posts

  • Wing

Aileron Skins

  • Glenn
  • June 9, 2008
  • 0

Scoured the skins in preparation for priming. I wanted to do this before bending, as it I knew it would be a lot easier than […]

  • Wing

Wing ribs

  • Glenn
  • December 23, 2007
  • 0

De-burr wing rib blanks. 1.37 hours.

  • Fuselage
  • Wing

Tie Down Rings, Torque Tube Bearing

  • Glenn
  • June 28, 2009
  • 0

Cleaned up Aileron Bellcranks. Went ahead and made 6-W-9-1 Tiedown Rings, 6-B-17 Rear Torque Tube Bearing. 4.63 hours.

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.