Skip to content
Saturday, August 22, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

6-W-3 9 Nose Rib Angles

Posted on September 20, 2008September 20, 2008 by Glenn

Cut and folded nose rib angles.

3.83 Hours

Posted in Wing

Post navigation

Previous: 6-W-4 1 & 2 Centre Spar Webs
Next: De-burring

Related Posts

  • Wing

Aileron Skins

  • Glenn
  • June 7, 2008
  • 0

Spent quite a bit of time getting the bend profile right using a scrap strip for practice. Then went on and made the aileron ribs. […]

  • Wing

Wing November 2009

  • Glenn
  • November 30, 2009
  • 0

Date Job Start Time Finish Time Total Time Decimal 7/11/2009 De-burr wing spars, set out rib angles and hat stiffeners, make cutouts in inner 16:00 […]

  • Wing

Wing ribs

  • Glenn
  • December 23, 2007
  • 0

Make first rear rib, work on joggle method. 1.7 hours.

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.