Skip to content
Tuesday, April 21, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Cutting block upper halves

Posted on October 21, 2007August 5, 2008 by Glenn

Make other halves of cutting blocks.

5.15 hours

Posted in Wing

Post navigation

Previous: Bevelling form blocks contd…
Next: Crimp cutouts in form blocks

Related Posts

  • Wing

Ailerons

  • Glenn
  • February 22, 2009
  • 0

Continue pre-drilling starboard aileron. 3.65 Hours.

  • Wing

Wing ribs

  • Glenn
  • December 23, 2007
  • 0

De-burr wing rib blanks. 1.37 hours.

  • Wing

Wing Spar Hat Stiffeners

  • Glenn
  • September 6, 2008
  • 0

The hat stiffeners for the spar webs proved to be quite a task

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.