Bevelling form blocks contd…

Posted on October 14, 2007August 5, 2008 by Glenn

Bevelling form blocks, mark position of flutes. Continue with cutting blocks.

6.52 hours

Posted in Wing

Post navigation

Previous: Cutting blocks, bevelling form blocks
Next: Cutting block upper halves

Related Posts

  • Wing

Wing Spars February 2010

  • Glenn
  • February 28, 2010
  • 0

Date Job Start Time Finish Time Total Time Decimal 6/02/2010 Spar Upgrade Root Doublers 6-ZU-1 2 11:45 13:00 1:15 1.25 14:15 15:43 1:28 1.47 16:15 […]

  • Fuselage
  • Wing

Tie Down Rings, Torque Tube Bearing

  • Glenn
  • June 28, 2009
  • 0

Cleaned up Aileron Bellcranks. Went ahead and made 6-W-9-1 Tiedown Rings, 6-B-17 Rear Torque Tube Bearing. 4.63 hours.

  • Wing

6-W-4 1 & 2 Centre Spar Webs

  • Glenn
  • September 14, 2008
  • 0

Dragged out a new sheet of 0.032

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.