Skip to content
Friday, November 20, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Hat Stiffeners contd…

Posted on September 7, 2008September 18, 2008 by Glenn

Finished making hat stiffeners.

4.83 Hours.

Posted in Wing

Post navigation

Previous: Wing Spar Hat Stiffeners
Next: Priming Rudder Parts

Related Posts

  • Wing

Nose ribs

  • Glenn
  • May 3, 2008
  • 0

Finish forming last two nose ribs, cut lightening holes. 4.97 hours.

  • Wing

Ailerons

  • Glenn
  • March 7, 2009
  • 0

Complete drilling ailerons, cleco. Ready for hinge fitting. 2.08 Hours.

  • Fuselage
  • Wing

Tie Down Rings, Torque Tube Bearing

  • Glenn
  • June 28, 2009
  • 0

Cleaned up Aileron Bellcranks. Went ahead and made 6-W-9-1 Tiedown Rings, 6-B-17 Rear Torque Tube Bearing. 4.63 hours.

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.