Skip to content
Friday, November 20, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Tip rib test #2

Posted on September 16, 2007July 22, 2008 by Glenn

Do second test of rudder tip rib with new form block.

7.6 hrs

Posted in Empennage

Post navigation

Previous: Rudder Tip Rib
Next: Made fluting pliers

Related Posts

  • Empennage

Rudder nose rib

  • Glenn
  • January 27, 2008
  • 0

Continued and made two more rudder nose ribs until I finished with one I was happy with. 2.58 hours.

  • Empennage
  • Horizontal Stabiliser

Stabiliser Ribs

  • Glenn
  • December 2, 2007
  • 0

I formed the stabiliser ribs as per the wing ribs, sandwiched between a form block and a blank. These all have a flange on the […]

  • Empennage

Elevator

  • Glenn
  • July 19, 2009
  • 0

Cut out Elevator Skin. 4 hours.

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.