Skip to content
Friday, August 15, 2025

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Tip rib test #2

Posted on September 16, 2007July 22, 2008 by Glenn

Do second test of rudder tip rib with new form block.

7.6 hrs

Posted in Empennage

Post navigation

Previous: Rudder Tip Rib
Next: Made fluting pliers

Related Posts

  • Empennage

Rudder Tip Rib

  • Glenn
  • January 28, 2008
  • 0

After three more attempts and experiments I finally arrived at one I was happy with. One of the problems I had was the plans are […]

  • Empennage

Rudder nose rib

  • Glenn
  • January 26, 2008
  • 0

Began forming the rudder nose rib. Realised I would probably not get it right first time, but the first effort wasn’t too bad. 2.67 hours

  • Empennage

Elevator ribs

  • Glenn
  • December 15, 2007
  • 0

Completed elevator ribs.   2.17 hours.

Copyright © 2025 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.