Tip rib test #2 Posted on September 16, 2007July 22, 2008 by Glenn Do second test of rudder tip rib with new form block. 7.6 hrs
Empennage Rudder Skeleton Glenn March 23, 2008 0 Continue with rudder build- drill and cleco doublers to spar. 3.83 hours.
Empennage Rudder nose rib Glenn January 26, 2008 0 Began forming the rudder nose rib. Realised I would probably not get it right first time, but the first effort wasn’t too bad. 2.67 hours