Skip to content
Monday, February 23, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Rudder Skins

Posted on May 31, 2008July 22, 2008 by Glenn

Form nose skin, begin laying out rear skin for fitting.

5.75 Hours.

Posted in Empennage

Post navigation

Previous: Rudder Skin
Next: Rudder Horn

Related Posts

  • Empennage

Rudder Skeleton

  • Glenn
  • December 27, 2008
  • 0

Re-assemble primed rudder skeleton, begin riveting. 0.75 Hours.

  • Empennage

Rudder Tip Rib

  • Glenn
  • January 28, 2008
  • 0

After three more attempts and experiments I finally arrived at one I was happy with. One of the problems I had was the plans are […]

  • Empennage

Elevator

  • Glenn
  • July 26, 2009
  • 0

Elevator construction. 5.92 hours.

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.