Skip to content
Friday, August 15, 2025

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Rudder Skins

Posted on May 31, 2008July 22, 2008 by Glenn

Form nose skin, begin laying out rear skin for fitting.

5.75 Hours.

Posted in Empennage

Post navigation

Previous: Rudder Skin
Next: Rudder Horn

Related Posts

  • Empennage

Marking off

  • Glenn
  • December 9, 2007
  • 0

Mark off rest of sheet and cut. 2.58 hours.

  • Empennage

Rudder Spar

  • Glenn
  • February 13, 2008
  • 0

Cut and bend vertical tail spar. Rudder RR#1. 1.58 Hours.

  • Empennage

Priming Rudder Parts

  • Glenn
  • September 14, 2008
  • 0

The temperature has finally got above 15 degrees

Copyright © 2025 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.