Skip to content
Monday, February 23, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Rudder Spar

Posted on February 13, 2008July 22, 2008 by Glenn

Cut and bend vertical tail spar. Rudder RR#1.
1.58 Hours.

Posted in Empennage

Post navigation

Previous: Lightening holes
Next: Rudder

Related Posts

  • Empennage

Rudder Assembly

  • Glenn
  • February 21, 2009
  • 0

Rudder final assembly Prime rudder skins internally, rivet to skeleton. 5.38 Hours.

  • Empennage

Rudder Skins

  • Glenn
  • August 23, 2008
  • 0

Trim rudder skin, align, pilot drill and cleco to skeleton. I spent quite a lot of time getting the alignment right and ensuring there was […]

  • Empennage

Rudder Tip Rib

  • Glenn
  • September 15, 2007
  • 0

I thought I would do some trial forming of the rudder tip rib in a piece of 2024 sheet scrap. This gave me some good […]

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.