Skip to content
Friday, November 20, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Rudder nose rib

Posted on January 27, 2008July 22, 2008 by Glenn

Continued and made two more rudder nose ribs until I finished with one I was happy with.

2.58 hours.

p1020122.JPG p1020121.JPG

Posted in Empennage

Post navigation

Previous: Rudder nose rib
Next: Rudder Tip Rib

Related Posts

  • Empennage

Rudder Assembly

  • Glenn
  • February 21, 2009
  • 0

Rudder final assembly Prime rudder skins internally, rivet to skeleton. 5.38 Hours.

  • Empennage

Rudder Skeleton

  • Glenn
  • December 28, 2008
  • 0

Continue riveting

  • Empennage

Elevator

  • Glenn
  • July 19, 2009
  • 0

Cut out Elevator Skin. 4 hours.

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.