Skip to content
Monday, February 23, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Rudder nose rib

Posted on January 27, 2008July 22, 2008 by Glenn

Continued and made two more rudder nose ribs until I finished with one I was happy with.

2.58 hours.

p1020122.JPG p1020121.JPG

Posted in Empennage

Post navigation

Previous: Rudder nose rib
Next: Rudder Tip Rib

Related Posts

  • Empennage

Rudder nose rib

  • Glenn
  • January 26, 2008
  • 0

Began forming the rudder nose rib. Realised I would probably not get it right first time, but the first effort wasn’t too bad. 2.67 hours

  • Empennage

Rudder Skeleton

  • Glenn
  • March 24, 2008
  • 0

Re-make nose rib again- not 100% happy with last one. Continue with rudder build- drill and cleco ribs to spar. 7.33 hours.

  • Empennage

Rudder Nose Skin

  • Glenn
  • August 24, 2008
  • 0

Align, drill and cleco rudder nose skin.

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.