Rudder nose rib

Posted on January 27, 2008July 22, 2008 by Glenn

Continued and made two more rudder nose ribs until I finished with one I was happy with.

2.58 hours.

p1020122.JPG p1020121.JPG

Posted in Empennage

Post navigation

Previous: Rudder nose rib
Next: Rudder Tip Rib

Related Posts

  • Empennage

6-T-4 5 Rudder Spar Doublers

  • Glenn
  • March 22, 2008
  • 0

Modify brake, then on advice from Debo Cox and Dave Clay left extra 100mm on material before bending, then decided to add extra bolts in […]

  • Empennage

Elevator

  • Glenn
  • July 26, 2009
  • 0

Elevator construction. 5.92 hours.

  • Empennage

Priming Rudder Parts

  • Glenn
  • September 14, 2008
  • 0

The temperature has finally got above 15 degrees