6-W-7 3 Hinge Doubler

Posted on November 9, 2008 by Glenn

6-W-7 3 Hinge Doubler.

.85 Hours.

Posted in Wing

Post navigation

Previous: Fuselage Parts
Next: Fuselage Parts

Related Posts

  • Wing

Bevelling form blocks contd…

  • Glenn
  • October 14, 2007
  • 0

Bevelling form blocks, mark position of flutes. Continue with cutting blocks. 6.52 hours

  • Wing

Crimp cutouts contd…

  • Glenn
  • October 30, 2007
  • 0

Complete cutouts in form blocks. 1.0 hour. Total for October 42.08 hours. Total time overall: 103.82 hrs

  • Wing

Nose Ribs

  • Glenn
  • April 26, 2008
  • 0

Continue forming Nose Ribs 6-W-5 2. 2.12 hours.

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.