Skip to content
Friday, August 15, 2025

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Standard Angles

Posted on November 29, 2008August 28, 2024 by Glenn

Cut U-channels down the middle to create finished angles.

4.08 Hours

Posted in Materials

Post navigation

Previous: Standard Angles
Next: Standard Angles

Related Posts

  • Materials

Spar Extrusions

  • Glenn
  • January 24, 2008
  • 0

6061-T6 T6511 1 1/2″ x 1/4″ bar arrived from Airport Metals in Tullamarine, Melbourne (03) 9310 5566 www.airportmetals.com.au Originally I ordered 6 lengths at 12 […]

  • Materials

Standard Angles

  • Glenn
  • December 6, 2008
  • 0

Finished de-burring remaining Standard Angles. 0.55 Hours.

  • Materials

Metal arrives!

  • Glenn
  • November 22, 2007
  • 0

Today a pallet of 24 sheets of 6061-T6 arrived from Performance Metals in Sydney. This should be enough to make the entire aircraft’s sheet metal […]

Copyright © 2025 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.