Skip to content
Friday, August 15, 2025

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Standard Angles

Posted on December 6, 2008August 28, 2024 by Glenn

Finished de-burring remaining Standard Angles.

0.55 Hours.

Posted in Materials

Post navigation

Previous: Standard Angles
Next: 6-B-10 1 Cabin Floor

Related Posts

  • Materials

Standard Angles

  • Glenn
  • November 17, 2008
  • 0

Continue cutting strips for Standard Angles. 0.88 Hours.

  • Materials

Standard Angles

  • Glenn
  • November 29, 2008
  • 0

Cut U-channels down the middle to create finished angles. 4.08 Hours

  • Materials

Standard Z Angles

  • Glenn
  • December 13, 2008
  • 0

Complete bending Z Angles

Copyright © 2025 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.