Skip to content
Monday, February 23, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Spar Caps & Angles

Posted on May 2, 2009September 23, 2009 by Glenn

Finish straightening Spar Cap Angles, mark off and cut Spar Caps to finished lengths.

2.63 Hours.

Posted in Wing

Post navigation

Previous: Spar Webs
Next: Spar Caps

Related Posts

  • Wing

Ailerons

  • Glenn
  • January 10, 2009
  • 0

Continued with aileron drilling

  • Wing

Cutting and form blocks

  • Glenn
  • October 7, 2007
  • 0

Finished form blocks, started on cutting blocks. 4.50 hours

  • Wing

Wing August 2009

  • Glenn
  • August 30, 2009
  • 0

Date Job Start Time Finish Time Total Time Decimal 23/08/2009 Flaps 14:00 16:17 2:17 2.28 16:45 17:50 1:05 1.08 29/08/2009 Flap skin 11:00 13:05 2:05 […]

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.