Skip to content
Friday, August 15, 2025

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Sheet Rack

Posted on February 24, 2008August 5, 2008 by Glenn

Spent this morning making a wall mounted rack to store cut parts.

2.50 Hours.

Posted in Tools

Post navigation

Previous: Rudder
Next: Cutting wing skin, spar webs, etc.

Related Posts

  • Tools

Made fluting pliers

  • Glenn
  • October 1, 2007
  • 0

Fluting pliers made from long nose vice-grips. The prongs are 1/4″ steel rod with the ends rounded and smoothed. 1.50 Hours

  • Tools

Workshop

  • Glenn
  • August 11, 2007
  • 0

Making new benches, re-arranging workshop. I built an 8′ X 3′ bench to start with, as I will be able to use this once the […]

  • Tools

Flanging Dies

  • Glenn
  • July 12, 2008
  • 0

Completed first flanging die, 115mm- not entirely successful- bend quite nice, but not to 45 degrees, or within the 15 degree tolerance. Probably use hand […]

Copyright © 2025 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.