Skip to content
Friday, August 15, 2025

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Flanging Dies

Posted on July 6, 2008July 22, 2008 by Glenn

Made 115mm dies from MDF.

3.62 Hours.

Posted in Tools

Post navigation

Previous: Flanging Dies
Next: Flanging Dies

Related Posts

  • Tools

Sheet Rack

  • Glenn
  • February 24, 2008
  • 0

Spent this morning making a wall mounted rack to store cut parts. 2.50 Hours.

  • Tools

Workshop

  • Glenn
  • August 11, 2007
  • 0

Making new benches, re-arranging workshop. I built an 8′ X 3′ bench to start with, as I will be able to use this once the […]

  • Fuselage
  • Tools

Fuselage, Tools January 2010

  • Glenn
  • January 17, 2010
  • 0

Date Job Start Time Finish Time Total Time Decimal 1/01/2010 Modify brake handle – move braces out from centre 11:00 12:50 1:50 1.83 Bend second […]

Copyright © 2025 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.