Skip to content
Monday, February 23, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Centre Spar Caps

Posted on May 17, 2009September 23, 2009 by Glenn

Fit caps to Centre Spar Webs.

1.27 Hours.

Posted in Wing

Post navigation

Previous: Centre Spar Doublers & Caps
Next: Main Spars

Related Posts

  • Wing

Aileron Skins

  • Glenn
  • June 9, 2008
  • 0

Scoured the skins in preparation for priming. I wanted to do this before bending, as it I knew it would be a lot easier than […]

  • Wing

Aileron Ribs & Tip Ribs

  • Glenn
  • June 8, 2008
  • 0

Finished the aileron ribs and made the tip ribs. I have to say, the plans can be annoying at times, as here they make no […]

  • Wing

Cutting 0.040 Sheet

  • Glenn
  • March 15, 2008
  • 0

More 40 thou sheet cutting. 2.23 hours.

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.