Skip to content
Tuesday, October 6, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Wing ribs

Posted on January 12, 2008August 5, 2008 by Glenn

RR #4, RR #4 opposite, RR#3.

4.78 hours.

Posted in Wing

Post navigation

Previous: Wing ribs
Next: Wing ribs

Related Posts

  • Wing

Aileron Bellcranks

  • Glenn
  • June 21, 2009
  • 0

Made 6-W-6 10 Bellcrank Support Channels and first Aileron Bellcrank 6-W-10 1. 3.1 hours.

  • Wing

Spar Webs

  • Glenn
  • April 26, 2009
  • 0

Pilot drill Main Spar Webs. 4.13 Hours.

  • Wing

Crimp cutouts contd…

  • Glenn
  • October 28, 2007
  • 0

Continue filing crimp cutouts in form blocks. 6.67 hours.

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.