Skip to content
Monday, February 23, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Wing ribs

Posted on January 12, 2008August 5, 2008 by Glenn

RR #4, RR #4 opposite, RR#3.

4.78 hours.

Posted in Wing

Post navigation

Previous: Wing ribs
Next: Wing ribs

Related Posts

  • Wing

Nose Ribs

  • Glenn
  • June 20, 2009
  • 0

Flange Nose Rib lightening holes. 2.55 hours.

  • Wing

Lightening holes

  • Glenn
  • February 10, 2008
  • 0

Continue with lightening holes. Once complete, bring in next sheet of 0.025 and start cutting. 5.15 Hours.

  • Wing

6-W-LO1 2 Locker Rear Panel

  • Glenn
  • December 6, 2008
  • 0

6-W-LO1 2 Locker Rear Panel

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.