Skip to content
Friday, August 15, 2025

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Aileron Bellcranks

Posted on June 21, 2009March 7, 2010 by Glenn

Made 6-W-6 10 Bellcrank Support Channels and first Aileron Bellcrank 6-W-10 1.

3.1 hours.

Posted in Wing

Post navigation

Previous: Nose Ribs
Next: Alieron Bellcranks

Related Posts

  • Wing

Spar Cap Angles

  • Glenn
  • April 13, 2009
  • 0

Continue cutting and bending. 3.75 Hours.

  • Wing

Alieron Bellcranks

  • Glenn
  • June 27, 2009
  • 0

Went flying with Tony this morning in his RV. Afternoon spent making second Aileron Bellcrank. 2 hours.

  • Wing

6-W-3 9 Nose Rib Angles

  • Glenn
  • September 20, 2008
  • 0

Cut and folded nose rib angles.

Copyright © 2025 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.