Skip to content
Friday, August 15, 2025

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Main Spars

Posted on May 23, 2009August 22, 2024 by Glenn

Bend Spar Web ends, drill lightening holes, trim angles on ends.

2.02 Hours.

Zenith 601 Spar
Posted in Wing

Post navigation

Previous: Centre Spar Caps
Next: Wing Ribs

Related Posts

  • Wing

Ailerons

  • Glenn
  • March 7, 2009
  • 0

Complete drilling ailerons, cleco. Ready for hinge fitting. 2.08 Hours.

  • Wing

6-W-4 1 & 2 Centre Spar Webs

  • Glenn
  • September 14, 2008
  • 0

Dragged out a new sheet of 0.032

  • Wing

Cutting 0.040 Sheet

  • Glenn
  • March 17, 2008
  • 0

Continue cutting 40 thou sheet. 2.03 hours

Copyright © 2025 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.