Skip to content
Monday, February 23, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Spar Caps & Angles

Posted on May 2, 2009September 23, 2009 by Glenn

Finish straightening Spar Cap Angles, mark off and cut Spar Caps to finished lengths.

2.63 Hours.

Posted in Wing

Post navigation

Previous: Spar Webs
Next: Spar Caps

Related Posts

  • Wing

Spar Caps

  • Glenn
  • May 3, 2009
  • 0

Spot drill then drill through spar caps. I used a small drill press of the type designed to hold a standard pistol grip electrid drill […]

  • Wing

Wing ribs

  • Glenn
  • December 29, 2007
  • 0

Continue with rear ribs- RR#7, RR#6 – also modified fluting pliers. 3.35 hours. Total for December 57.60 hours. Total time overall: 193.97 hours.

  • Wing

6-W-7 3 Hinge Doubler

  • Glenn
  • November 9, 2008
  • 0

6-W-7 3 Hinge Doubler. .85 Hours.

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.