Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Ailerons

Posted on February 22, 2009 by Glenn

Continue pre-drilling starboard aileron.

3.65 Hours.

Posted in Wing

Post navigation

Previous: Rudder Assembly
Next: Fuselage form blocks

Related Posts

  • Wing

Cutting block upper halves

  • Glenn
  • October 21, 2007
  • 0

Make other halves of cutting blocks. 5.15 hours

  • Wing

Wing November 2009

  • Glenn
  • November 30, 2009
  • 0

Date Job Start Time Finish Time Total Time Decimal 7/11/2009 De-burr wing spars, set out rib angles and hat stiffeners, make cutouts in inner 16:00 […]

  • Wing

Wing Ribs

  • Glenn
  • May 29, 2009
  • 0

Continue flanging ribs with the car and jack… photos coming. 2.05 Hours.