Skip to content
Friday, August 15, 2025

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Standard Angles

Posted on November 17, 2008August 28, 2024 by Glenn

Continue cutting strips for Standard Angles.

0.88 Hours.

Posted in Materials

Post navigation

Previous: Standard Angles
Next: Standard Angles

Related Posts

  • Materials

Spar Extrusions

  • Glenn
  • January 24, 2008
  • 0

6061-T6 T6511 1 1/2″ x 1/4″ bar arrived from Airport Metals in Tullamarine, Melbourne (03) 9310 5566 www.airportmetals.com.au Originally I ordered 6 lengths at 12 […]

  • Materials

Standard Angles

  • Glenn
  • November 16, 2008
  • 0

Drag out another sheet, begin cutting strips to make standard angles 6-T-1 L

  • Materials

Standard Angles

  • Glenn
  • November 29, 2008
  • 0

Cut U-channels down the middle to create finished angles. 4.08 Hours

Copyright © 2025 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.