Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

6-W-7 3 Hinge Doubler

Posted on November 9, 2008 by Glenn

6-W-7 3 Hinge Doubler.

.85 Hours.

Posted in Wing