Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

6-W-7 3 Hinge Doubler

Posted on November 9, 2008 by Glenn

6-W-7 3 Hinge Doubler.

.85 Hours.

Posted in Wing

Post navigation

Previous: Fuselage Parts
Next: Fuselage Parts

Related Posts

  • Wing

Lightening holes

  • Glenn
  • February 9, 2008
  • 0

Continue with lightening holes. 3.30 Hours

  • Wing

Doublers, Centre Spar Caps

  • Glenn
  • May 9, 2009
  • 0

Mark and cut Spar Cap Doublers and Centre Spar Caps. 1.18 Hours.

  • Wing

Wing ribs truing

  • Glenn
  • January 25, 2008
  • 0

Completed truing up the flanges on the rear ribs and adjusting any bows in them. 1.5 hours.