6-W-7 3 Hinge Doubler

Posted on November 9, 2008 by Glenn

6-W-7 3 Hinge Doubler.

.85 Hours.

Posted in Wing

Post navigation

Previous: Fuselage Parts
Next: Fuselage Parts

Related Posts

  • Wing

Wing ribs

  • Glenn
  • December 16, 2007
  • 0

Start cutting 0.025 sheet- rough cut wing rear ribs before trimming with router in cutting blocks. 4.22 hours.

  • Wing

Nose Ribs

  • Glenn
  • June 20, 2009
  • 0

Flange Nose Rib lightening holes. 2.55 hours.

  • Wing

Wing Spars

  • Glenn
  • August 31, 2008
  • 0

Set out wing spar webs. Also spent some time divising methods of forming Hat Stiffeners. 6.17 Hours.