Skip to content
Friday, August 15, 2025

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Spar Tips

Posted on November 2, 2008November 9, 2008 by Glenn

Fabricate Spar Tips.

3.52 Hours.

Posted in Wing

Post navigation

Previous: Fuselage Parts
Next: 6-B-8 8 Heel Support

Related Posts

  • Wing

Bevelling form blocks contd…

  • Glenn
  • October 14, 2007
  • 0

Bevelling form blocks, mark position of flutes. Continue with cutting blocks. 6.52 hours

  • Wing

Wing September 2009

  • Glenn
  • September 27, 2009
  • 0

Date Job Start Time Finish Time Total Time Decimal 12/09/2009 Make timber brackets for spar assembly 15:00 18:00 3:00 3.00 13/09/2009 Drill out spar pilot […]

  • Wing

Spar Webs

  • Glenn
  • April 26, 2009
  • 0

Pilot drill Main Spar Webs. 4.13 Hours.

Copyright © 2025 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.