Skip to content
Tuesday, October 6, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Spar Tips

Posted on November 2, 2008November 9, 2008 by Glenn

Fabricate Spar Tips.

3.52 Hours.

Posted in Wing

Post navigation

Previous: Fuselage Parts
Next: 6-B-8 8 Heel Support

Related Posts

  • Wing

Wing ribs

  • Glenn
  • December 18, 2007
  • 0

Get blanks ready for trimming. 2.47 hours.

  • Wing

Rear Ribs

  • Glenn
  • April 19, 2008
  • 0

Form other RR#8, RR#9. 0.98 hours.

  • Wing

Wing ribs

  • Glenn
  • December 22, 2007
  • 0

Trim blanks. 6.05 hours.

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.