Skip to content
Monday, February 23, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Spar Tips

Posted on November 2, 2008November 9, 2008 by Glenn

Fabricate Spar Tips.

3.52 Hours.

Posted in Wing

Post navigation

Previous: Fuselage Parts
Next: 6-B-8 8 Heel Support

Related Posts

  • Wing

Cutting 0.040 Sheet

  • Glenn
  • March 17, 2008
  • 0

Continue cutting 40 thou sheet. 2.03 hours

  • Wing

Crimp cutouts contd…

  • Glenn
  • October 30, 2007
  • 0

Complete cutouts in form blocks. 1.0 hour. Total for October 42.08 hours. Total time overall: 103.82 hrs

  • Wing

Ailerons.

  • Glenn
  • December 16, 2007
  • 0

Bend remaining ribs, cut aileron skins and de-burr. 3.65 hours.

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.