Skip to content
Monday, February 23, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Fuselage Parts

Posted on October 5, 2008 by Glenn

Continued cutting 0.032 parts for fuselage.

1.67 Hours.

Posted in Fuselage

Post navigation

Previous: 6-B-1 1, 6-B-5 1&2
Next: Fuselage Parts

Related Posts

  • Fuselage

Fuselage December 2009

  • Glenn
  • December 19, 2009
  • 0

Date Job Start Time Finish Time Total Time Decimal 5/12/2009 Form bulkheads 6-B-12 1, 2 & 3 12:45 15:52 3:07 3.12 16:30 18:00 1:30 1.50 […]

  • Fuselage

6-B-5 Gear Channel

  • Glenn
  • September 21, 2008
  • 0

Cut and bend 6-B-5 Gear Channel.

  • Fuselage

6-B-8 1 Gear Gussets

  • Glenn
  • December 6, 2008
  • 0

Marked out gear gussets from 40 thou stock. 0.5 Hours.

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.