Skip to content
Monday, February 23, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Crimp cutouts contd…

Posted on October 28, 2007August 5, 2008 by Glenn

Continue filing crimp cutouts in form blocks.

6.67 hours.

Posted in Wing

Post navigation

Previous: Crimp cutouts in form blocks
Next: Crimp cutouts contd…

Related Posts

  • Wing

Lightening holes

  • Glenn
  • February 6, 2008
  • 0

Continue with wing rib lightening holes. 0.70 Hours

  • Wing

Nose ribs

  • Glenn
  • May 3, 2008
  • 0

Finish forming last two nose ribs, cut lightening holes. 4.97 hours.

  • Wing

Nose rib form blocks

  • Glenn
  • November 3, 2007
  • 0

Filed crimp recesses in nose rib form blocks. 4.80 hours.

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.