Wing Spars

Posted on August 31, 2008September 7, 2008 by Glenn

Set out wing spar webs. Also spent some time divising methods of forming Hat Stiffeners.

6.17 Hours.

Posted in Wing

Post navigation

Previous: Rudder
Next: Wing Spar Hat Stiffeners

Related Posts

  • Wing

Spar Caps

  • Glenn
  • June 6, 2009
  • 0

Spar cap fitting and pre-drilling. 4.83 hours.

  • Wing

Aileron Bellcranks

  • Glenn
  • June 21, 2009
  • 0

Made 6-W-6 10 Bellcrank Support Channels and first Aileron Bellcrank 6-W-10 1. 3.1 hours.

  • Wing

Wing ribs

  • Glenn
  • January 23, 2008
  • 0

Joggles completed using block in vice method- see photos. I had more success by cramping in this method and hammering down with a piece of […]