Skip to content
Friday, August 15, 2025

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Cutting and form blocks

Posted on October 7, 2007August 5, 2008 by Glenn

Finished form blocks, started on cutting blocks.

4.50 hours

Posted in Wing

Post navigation

Previous: Made fluting pliers
Next: Cutting blocks, bevelling form blocks

Related Posts

  • Wing

Flap Ribs

  • Glenn
  • June 15, 2008
  • 0

Completed fabricating flap ribs. Spent the afternoon going over what parts to buy from factory due to difficulty in fabricating. These mostly consisted of 40 […]

  • Wing

Ailerons

  • Glenn
  • January 10, 2009
  • 0

Continued with aileron drilling

  • Wing

De-burring

  • Glenn
  • September 21, 2008
  • 0

De-burr Nose Rib Angles and Hat Stiffeners, various other parts. 2.75 Hours.

Copyright © 2025 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.