Skip to content
Saturday, August 22, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Nose Ribs

Posted on April 12, 2008August 5, 2008 by Glenn

Begin cutting new sheet of 0.025 for nose ribs.

2.58 hours.

Posted in Wing

Post navigation

Previous: Firewall Stiffeners
Next: Nose Ribs, Rear Ribs

Related Posts

  • Wing

6-W-4 1 & 2 Centre Spar Webs

  • Glenn
  • September 14, 2008
  • 0

Dragged out a new sheet of 0.032

  • Wing

Alieron Bellcranks

  • Glenn
  • June 27, 2009
  • 0

Went flying with Tony this morning in his RV. Afternoon spent making second Aileron Bellcrank. 2 hours.

  • Wing

Wing ribs

  • Glenn
  • December 23, 2007
  • 0

Make first rear rib, work on joggle method. 1.7 hours.

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.