Skip to content
Saturday, August 22, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Cutting 0.040 Sheet

Posted on March 17, 2008August 5, 2008 by Glenn

Continue cutting 40 thou sheet.

2.03 hours

Posted in Wing

Post navigation

Previous: Cutting 0.040 Sheet
Next: Stabiliser Spar

Related Posts

  • Wing

Wing Spars

  • Glenn
  • August 31, 2008
  • 0

Set out wing spar webs. Also spent some time divising methods of forming Hat Stiffeners. 6.17 Hours.

  • Wing

Centre Spar Caps

  • Glenn
  • May 17, 2009
  • 0

Fit caps to Centre Spar Webs. 1.27 Hours.

  • Wing

Wing ribs

  • Glenn
  • December 26, 2007
  • 0

Continue with rear ribs. 3.97 hours.

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.