Skip to content
Tuesday, October 6, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Cutting 0.040 Sheet

Posted on March 17, 2008August 5, 2008 by Glenn

Continue cutting 40 thou sheet.

2.03 hours

Posted in Wing

Post navigation

Previous: Cutting 0.040 Sheet
Next: Stabiliser Spar

Related Posts

  • Wing

Spar Caps

  • Glenn
  • June 7, 2009
  • 0

Complete pre-drilling spar caps. Pre-drill end of spars for tips, trim doublers and caps. 2.93 hours.

  • Wing

Ailerons

  • Glenn
  • March 7, 2009
  • 0

Complete drilling ailerons, cleco. Ready for hinge fitting. 2.08 Hours.

  • Wing

Wing ribs truing

  • Glenn
  • January 25, 2008
  • 0

Completed truing up the flanges on the rear ribs and adjusting any bows in them. 1.5 hours.

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.