Skip to content
Friday, November 20, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Cutting 0.040 Sheet

Posted on March 15, 2008August 5, 2008 by Glenn

More 40 thou sheet cutting.

2.23 hours.

Posted in Wing

Post navigation

Previous: Cutting 0.040 Sheet
Next: Cutting 0.040 Sheet

Related Posts

  • Wing

Crimp cutouts contd…

  • Glenn
  • October 30, 2007
  • 0

Complete cutouts in form blocks. 1.0 hour. Total for October 42.08 hours. Total time overall: 103.82 hrs

  • Wing

Spar Cap Angles

  • Glenn
  • April 18, 2009
  • 0

Spar Cap Angles – start second angle

  • Wing

Nose Ribs

  • Glenn
  • June 20, 2009
  • 0

Flange Nose Rib lightening holes. 2.55 hours.

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.