Skip to content
Monday, February 23, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Sheet Rack

Posted on February 24, 2008August 5, 2008 by Glenn

Spent this morning making a wall mounted rack to store cut parts.

2.50 Hours.

Posted in Tools

Post navigation

Previous: Rudder
Next: Cutting wing skin, spar webs, etc.

Related Posts

  • Tools

Flanging Dies

  • Glenn
  • July 6, 2008
  • 0

Made 115mm dies from MDF. 3.62 Hours.

  • Tools

Homemade Sheet Metal Bending Brake: A Step-by-Step Guide

  • Glenn
  • August 27, 2024
  • 0

Introduction: Once I decided I was scratch building from aluminium, having something to bend sheet metal was essential, but buying a commercial brake wasn’t affordable, […]

  • Tools

Flanging Dies

  • Glenn
  • July 5, 2008
  • 0

After some consideration I’ve decided to make the flanging dies from MDF, which should work okay. The difficulty in obtaining or having these items specially […]

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.